ALFRAN supplied 1400 tons of heat-resistant materials for this construction project, including insulating materials and other accessories required for the installation. The supply included all of Clinker’s production lines, except for the rotating kiln. In addition, ALFRAN was responsible for the basic and detailed engineering associated to the installation of 420 tons of Alfranjet® concrete, as well as drying the coating by convection, which was carried out through our subsidiary Intec-Heat. Currently, ALFRAN continues to provide technical support and post-sales follow-up for this important client in heat-resistant materials.
Location
Dominican Republic Distrito Municipal Villa Gautier, San José de los Llanos, San Pedro de Macorís
Date
September 2014 – May 2015
Speciality
Heat Resistance, Heat Treatment
Sector
Cement