Disassembly and assembly of insulation in the enclosures and ceilings of 3 high-capacity tanks.
Replacement of the new insulation of the tank enclosures, after repairing the damaged ferrules and replacing the access steps. New insulation was installed on 100% of the ceiling surface of the 3 tanks. Total insulated surface: 5,500 m2, 8,000 hours of work. Average workforce: 10 operators.
Location
Puertollano, Spain
Date
Sector
Oil & Gas
Speciality
Insulation